add this code to the page that has the chart on it:
<%
function switchMonthDay(theDate)
dim theMonth,theDay,theYear
theMonth = Left(theDate,inStr(theDate,"/")-1)
theYear = Right(theDate, Len(theDate) - inStrRev(theDate,"/"))
theDay = Mid(theDate,inStr(theDate,"/")+1, inStrRev(theDate,"/")-inStr(theDate,"/")-1)
switchMonthDay = theDay & " / " & theMonth & " / " & theYear
end Function
%>
then locate these two code blocks:
<%=Request.QueryString(" FD")%>
<%=Request.QueryString("LD")%>
and change them to:
<%=switchMonthDay(Request.QueryString(" FD"))%>
<%=switchMonthDay(Request.QueryString("LD"))%>