Hi Ray,
I was sure we had this one resolved but I've spotted another occurence of this problem on this site, where the date defaults back to 01-01-70.
If you sign into the site with the user information provided below and select order ref 3835, you will see six tabs across the top:
Certificate / Step 1 / Step 2 / Step 3 / Step 4 / Step 5
Each of the "Step" tabs has an "Edit & Save" button at the bottom.
If you go to Tab 1 and click "Edit & Save", it reverts the date back to 01-01-70, however this doesn't happen if you select the "Edit & Save" button on any of the other Step tabs.
Can you see why this is? FTP details provided below also.
Thank you.
NJ
EDIT:
On an update form, should the defaultDate be null in the datepicker script, considering that value should be being populated from database?
Could this be the cause of the 01-01-70 issue?
EDIT 2:
Commented out the defaultDate: null line in the script and now it's saving the date as 04-08-01!?